Friday, November 14, 2008

Foundation Walls


Here are the foundation walls 
with the forms stripped off

Monday, November 10, 2008

Plan Scan


Ok, got a scan of the plan. The area where its marked walk in closet and most of the bathroom
are where our existing bedroom is. What looks
like a corner soaker tub is going to be a large
shower with 2 heads and a corner seat. Our closet now will become the closet for the front bedroom and that rooms closet and the hallway
linen closet will be removed providing added floor space in that room.

Friday, November 7, 2008

Here is the brick before I started
screwing the furring strips on. The
old 4x12 ruf cedar mantle has 
already been removed.
Here furring strips have been 
screwed to the brick. Furring 
strips gives me something solid
to nail the facing to.
A work in progress. The main facing is up
but the hearth front is not.
Here it is all done and pretty

Tuesday, November 4, 2008

Pump It Up


They used a concrete pump to pour the foundation walls.
Here Brad, (black shirt) Shane, (white shirt) and the pump operator
(grey shirt) place concrete in the forms. Took about 5 minutes for
them to pour 36ft of wall.

Saturday, November 1, 2008

Seal Of Approval

There is a sign in our house that says.....
"This House Is Owned And Operated Solely For The Comfort And Convenience Of My Dog"


Misty added her autograph to the footings....... Cant wait to hear what Brad the job foreman has to say monday
Here the footing is poured and the upright rebar that will anchor the stem wall is in place. This was friday, the crew will build the stem wall forms monday morning and pour them in the afternoon.

Every Building Needs A Strong Foundation

Formed up and ready to pour. The footing forms are staked in place and rebar is drilled into the existing house foundation.
Then you wait...........

For the City Inspector.........
To sign off on the footings on your permit.

Then you wait..........
For the concrete truck to show up.