Thursday, October 30, 2008

Project Overview

What Started out as a "Grand Plan" has now been reduced to a "Workable Plan". (Its always about the Money)
The Project is an 16'X20' addition which will become our new bedroom, our existing bedroom will become a bathroom and walk in closet. At the same time the linen closet in the hallway and the closet in the front bedroom will be removed and the closet in our current bedroom will be switched to the closet for the front bedroom. I would post a scan of the drawings but Windows Vista made our scanner obsolete.
To go along with the changes to the back of the house we have replaced windows on the front of the house and removed the front breezeway door. Changing out the picture window in the dining room allowed us to remove the 2 different kinds of fake stone on front of the house and will be resided with siding to match rest of house.
The crown jewel will be the bathroom. The corner Jacuzzi tub was cut from the project in favor of a large shower with seating and 2 shower heads, just not enough room for both. Oil rubbed bronze finished fixtures will look great with the golden sand ceramic tile we have picked out.